Frankfurt/Oder, Kleist Kongress- und Kulturzentrum
Reconstruction of upper machinery, safety system
New electronic control system satisfying the requirement class 5 according to DIN V 19250
- Trusses, fly- and pulley lofts, working galleries
- Portal screens and portal bridge with hydraulic drives
- Portal towers hydraulically lifteable into the stage tower
- Proscenium tower, curtain system
- 8 pcs. fly bars, payload 500 kg, lifting speed 1.0 m/s
- 5 pcs. fly bars, payload 300 kg, lifting speed 1.0 m/s
- 8 pcs. point hoist, payload 200 kg, lifting speed 1.0 m/s
- Electronic control system satisfying the requirement class 5 according to DIN V 19250 for pointhoists and fly bars and a turntable
- 1 pc. lightning bar, payload 700 kg, lifting speed 0.1 m/s
- 1 pc. lightning bar, payload 500 kg, lifting speed 0.1 m/s
- 6 pcs. side and backstage fly bars, payload 300 kg, lifting speed 0.1 m/s
- 4 pcs. auditorium and procsenium fly bars, payload 300 kg, lifting speed 0.2 m/s
- 26 pcs. manual fly bars
- 1 pc. iron curtain with hydraulic drive, side and backstage gates with hydraulic drives, desmoking hoods over man stage and auditorium