Göggingen, Kurhaustheater
Reconstruction of upper machinery, lower machinery and safety system
- Orchestra elevator with spiralift
- Portal bridge with electronic drive
- 17 pcs. fly bars, payload 300 kg, lifting speed 0,05 / 0,15 m/s
- 2 pcs. lightning bars, payload 1000 kg, lifting speed 0,05 / 0,15 m/s