Kiel, Opernhaus
Reconstruction of upper machinery, lower machinery, safety system
New electronic control system satisfying the requirement class 5 according to DIN V 19250
- 6 pcs. double floor stage elevators, dimensions 2m x 6m each, lifting speed 0.2 m/s with electronic steel rope drive
- 1 pc. drive for side stage wagon
- 1 pc. drive for turntable
- 1 Stck Antrieb für Drehscheibe
- Reconstruction of fly- and pulley loft, reconstruction of working galleries
- Reconstruction portal bridge, curtain system
- 40 pcs. fly- and side bars, payload 500 kg, lifting speed 1.5m/s
- 8 pcs. point hoists, payload 250 kg, lifting speed 1.5 m/s
- 1 pc. sound curtain, payload 1000 kg, lifting speed 1.5 m/s
- 1 pc. veil curtain, payload 500 kg, lifting speed 1.5 m/s
- 1 pc. portal fly bar, payload 500 kg, lifting speed 1.5 m/s
- 3 pcs. lightning bars, payload 1500 kg, lifting speed 0.4 m/s
- 2 pcs. lightning bars under the working galleries, payload 500 kg, lifting speed 0.2 m/s
- 8 pcs. side- and backstage bars, payload 500 kg, lifting speed 0.2 m/s
- 1 pc. drive for side stage gate
- 1 pc. drive for iron curtain
- 29 pcs. drives for smoke windows
- Electronic control system TTS EMS II satisfying the requirement class 5 according to DIN V 19250