München, Kammerspiele
Reconstruction of upper machinery, safety system
New electronic control system satisfying the requirement class 5 according to DIN V 19250
- Fly- and pulley loft, working galleries, technical ceiling front stage
- Portal tower, portal bridge with electrical drive, dollysatem for existing chain hoists
- 36 pcs. portal fly bars, payload 500 kg, lifting speed 1.0 m/s, each fly bar can be converted to a manual hoist by 5 moveable manual drive units
- 30 pcs. vertically moveable pointhoists, payload 200 kg, lifting speed 1.0 m/s
- 1 pc. portal bars, payload 300 kg, lifting speed 1.0 m/s
- 5 pcs. point hoists, payload 50 kg, lifting speed 0.3 m/s
- 1 pc. plafond hoist under portal bridge, payload 300 kg, lifting speed 0.3 m/s
- 3 pcs. fly bars in scenery hall, payload 500 kg, lifting speed 0.3 m/s
- 3 pcs. front stage fly bars, payload 250 kg, lifting speed 0.3 m/ss
- 1 pc. hand up bar for curtain system
- Reconstruction of existing winches
- Smoke hoods over stage, iron curtain, hanging piece magazine
- Electronic control system TTS EMS II satisfying the requirement class 5 according to DIN V 19250